Board of Trustees


The trustees meet the second Tuesday of each month to discuss the physical well being, the needs, and the care of the church property.

The major project of the year was the painting and carpeting of the sanctuary. Thanks to the Memorial Fund and the generous contributions of the members and friends of the congregation and the income generated from the church endowment we were able to accomplish this project.

The storm windows were also painted this year. When the church connected to the village sewer system the electrical connection between the church and garage was broken. It was repaired but during the year power to the garage was lost. A new connection was run from the church to the garage and an electrical box was installed in the garage. During the year a new panic bar was also installed on the Fellowship Hall entrance door.





| back to the report index |

© 1999-2005 First Presbyterian Church of Broadalbin
Design & Maintenance by Wallin-Eddy, Inc.